<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
 <!-- Generated by Ektron CMS400.NET -->
 <channel>
  <title>WEF Discussion Forums : Biosolids and Residuals : Anaerobic Digestion &amp; Green Power</title>
  <description></description>
 <item>
  <title></title>
  <description><![CDATA[<p>I understand there has been great advances in specific testing procedures for methane potential of different waste streams.  I also have learned that these have a significant cost associated with them.  Does anyone have experience or guidance for their testing protocols that are used prior to accepting high strength waste being used to increase methane production at a facility?  Also, if anyone would be willng to share their experiences in trying to find the "right" wastestream for their facility that would be great.  Thank you. </p>
<p> </p>
<p>Tim R.</p>
<p>City of Whitewater, WI</p>
<p>Wastewater Utility    </p>
<br />]]></description>
  <pubDate>Thu, 01 Mar 2012 16:03:17 GMT</pubDate>
 </item>
 </channel>
</rss>
