July 2007, Vol. 19, No. 7


Table of Contents
 
Front Page 
Features
News
From the Editors
Letters
Research Notes
Small Communities
Briefs
Waterline
Technology Focus: Odor Control
Certification Quiz
Plant Profile
Business
Products
Water Volumes
Advertiser Index

Resources
Archives
Contact Us
Subscribe to WE&T
Author Information
Advertise in WE&T


 

Certification Quiz

Test Your Knowledge of Headworks Treatment

True or False

1. Screening presses and vacuum containers are used at wastewater treatment plants to remove the liquid from the screenings before transport to reduce excess water, volume, and weight.

2. The spacing between the bars in bar screens is typically 0.25 to 0.5 in. (6.35 to 12.7 mm).

3. The chains used in chain-driven bar screens tend to stretch from wear.

4. The basic components of wastewater grit material consists of such materials as sand, cinders, rocks, coffee grounds, cigarette filter tips, and other relatively nonputrescible organic and inorganic substances.

5. Grit classifiers remove organics from the grit.

Multiple Choice
6. Hand-cleaned grit chambers are typically used in what size plants?
a. Large plants with flows greater than 11 mgd.
b. Medium-sized plants with flows between 6 and 10 mgd.
c. Small plants with flows generally between 3 and 5 mgd.
d. The smallest plants with flows generally less than 1 mgd.

7. Aerated grit chambers provide a period of wastewater detention to trap grit through air-induced rotation of the wastewater at approximately what speed?
a. 1 ft/s (0.3 m/s).
b. 3 ft/s (0.9 m/s).
c. 5 ft/s (1.5 m/s).
d. 7 ft/s (2.1 m/s).

8. Calculate the monthly screenings disposal cost for a 10-mgd wastewater treatment plant. Assume that on a typical day, 1.2 yd3, 2.3 yd3, and 0.7 yd3 of compacted screenings were removed during the first, second, and third shifts, respectively. The plant pays $35 to dump each 12-ft-long, 4-ft-wide, 5-ft-high container at the landfill.
a. $66 per month.
b. $147 per month.
c. $380 per month.
d. $515 per month.

Questions were developed by Steve Spicer and reviewed by the Association of Boards of Certification (Ames, Iowa) Validation and Examination Committee.

Answer Key
1. True.
2. False. Bar screen spacing is typically 0.75 to 2 in. (19 to 51 mm).
3. True.
4. True.
5. True.
6. d.
7. a.
8. d. Calculate the amount of screenings collected each month: (1.2 yd3 + 2.3 yd3 + 0.7 yd3) × 30 d = 126 yd3 per month. Calculate the volume of the screenings container in yards: (12 ft × 0.33 yd/ft) × (4 ft × 0.33 yd/ft) × (5 ft × 0.33 yd/ft) = 8.6 yd3. Calculate how many containers are needed each month: 126 yd3 per month ÷ 8.6 yd3 per container = 14.7 containers per month. Calculate the cost: 14.7 containers per month × $35 per container ≈ $515 per month.

References

Water Environment Federation (2007). Operation of Municipal Wastewater Treatment Plants; Manual of Practice No. 11, Fifth Ed. Alexandria, Va.: Water Environment Federation.


©2007 Water Environment Federation. All rights reserved.